Shagyrly-Shomyshty Gas-Main Pipeline Central Asia – Center Gas Pipeline Construction
Customer
Caspian Gas Corporation, USA
General contractor
Foreign Enterprise Belstroytransgaz, Belarus
Period of cooperation
2007 - 2009
Tasks
- Organization of the technological communication system along the gas pipeline
- Execution of design and installation works for the provision of Shagyrly-Shomyshty deposit shift camp personnel with communication
Equipment
- HiPath 4000 exchange
- R&S radio trunking communication system
- Siemens OTN optical transmission system
Works
- Engineering
- Design works
- Equipment delivery
- Equipment installation
- Laying of 98 km FO cable in 40-mm protective polyethylene pipe
- FO cable installation
- Installation of four 60 m communication towers
In the process of the project implementation there was performed the installation of four 60 m communication towers and laying of 98 km protective pipe in severe climatic and terrain conditions. Thus the protective pipe was laid at the depth of 1.2 m in the 4-5 category ground (marl, granite), air temperatures varied from -30 in winter to +50 in summer, altitude difference – up to 115 m. In addition, strong winds and sand storms which are common for that area obstructed elevated jobs.
There was installed trunking communication equipment and OTN optical transmission system.
There were performed design and installation works on the provision of telephone communication for the shift camp and compressor station, HiPath 4000.